Skip to content Skip to left sidebar Skip to footer

Bridge Work on Route 110 8/30 & 8/31

VTrans is drilling at the bridge near the town hall today 8/30/23 and possibly tomorrow 8/31/23.

The purpose is to determine what materials are within the bridge, as it is designated to be replaced

in the future.

Please expect delays.